View Single Post
Old 12-26-2012, 22:34   #17
G29Reload
Tread Lightly
 
G29Reload's Avatar
 
Join Date: Sep 2009
Posts: 12,345
Quote:
Originally Posted by NorthernAlpine View Post
2. Double Solar Production/Capacity, install transfer switch for 3 rooms and 2 appliances
This is on my list for 2013 also. A solar project. Just had to pull wires for a new receptacle in the kitchen, while I was at it pulled a spare line, runs from attic to basement. Gonna pipe in a solar panel and connect up a battery bank.
__________________
Avenge me...AVENGE ME!

To view links or images in signatures your post count must be 10 or greater. You currently have 0 signatures.
G29Reload is offline   Reply With Quote